MBE Editorial

174 Articles

Advanced Fire Performance Strategies for Metal Cladding: Managing Cavity Fire Spread and System Integration

Metal cladding fire performance requires assembly-level compliance, not just product ratings. Learn how to…

Navigating the Complexities of Rainscreen Attachment Systems: Balancing Structural Performance, Thermal Efficiency, and Moisture Control

Rainscreen attachment failures trace to vague specs and ignored physics. Learn how thermal bridging,…

Peel-and-Stick Flashing Membranes at Structural Steel Embed

Peel-and-stick flashing membranes fail at structural steel embeds due to substrate incompatibility, primer conflicts,…

Sealant Joint Design at Dissimilar Cladding Transitions: Where Movement and Adhesion Fail

Transition joints between dissimilar cladding systems fail not because either system is defective, but…

Sloped Glazing and Skylight Curb Integration at Roof Transitions: Where Water Control Fails

Sloped glazing curb assemblies fail at the roof-to-wall transition when condensate drainage paths are…

Thin Stone Veneer Panels: Kerf Depth and Anchor Risk

Thin stone veneer panels reduced through value engineering create dangerous kerf anchor failures. Learn…

Epoxy vs. Mechanical Anchors in Stone Facade Systems: Performance, Failure Risk, and Selection

Forensic data from North American urban cores reveals a consistent failure pattern in epoxy-anchored…

Thin Brick Veneer on Precast Panels: Bond Failure Risk and Long-Term Performance

Thin brick on precast panels is failing in clusters at panel corners. The cause…

ACM vs. Solid Aluminum vs. Steel Panels: A Specifier’s Guide to Performance, Durability, and Selection

A specifier's guide comparing ACM, solid aluminum and steel cladding for commercial rainscreen facades,…

Elastomeric Coatings on Masonry: Where Adhesion, Moisture, and Crack Bridging Fail

Forensic investigations reveal elastomeric coatings on aging masonry often trap moisture and accelerate spalling.…

Zinc Gutters at Facade Transitions: Where Corrosion and Water Management Fail

Zinc drainage components fail prematurely on North American facades when galvanic couples with steel,…

Peel-and-Stick Membranes at Below-Grade Wall Transitions: Where Adhesion and Waterproofing Fail

Below-grade-to-above-grade membrane transitions fail due to trade gaps, substrate issues and sequencing problems. Here…

Upgrade to Modern Building Envelope today and take advantage of these fantastic updates!